Skip to content
Nova Building Co

Interior

Cabinetry, specified and set as part of the build

Cabinetry is usually the finish end of something larger, where the boxes have to land on a floor that is already flat, under a ceiling that is already framed, in front of plumbing and electrical that were roughed to the drawing.

Kitchen with a navy island and white perimeter cabinets
Navy island and white perimeter cabinets, brass hardware
  • Framed and frameless construction
  • Plywood boxes, dovetailed drawers, soft-close as the default spec
  • Dover showroom for comparing doors, finishes and samples
  • Ordered early and sequenced ahead of countertop templating
  • NH Seacoast and southern Maine

Cabinets are a build decision before they are a shopping decision

By the time most people are looking at door samples, half the decisions that determine whether the cabinetry fits are already made: where the range vent duct runs, whether the window centers on the sink wall, how thick the finished floor will be, because that sets the dishwasher opening height, and whether the wall you want gone is carrying load. Handled inside the larger project, the framer, the plumber, the electrician and the installer all work off the same layout, and when the layout changes, one person pushes the change to all of them.

The cabinet order also goes in early, because cabinetry is the longest lead item in a typical renovation. Ordering in week two of a twelve-week job is normal; ordering when the drywall is done leaves a job sitting finished-except-for-the-kitchen for two months.

  • Appliance specs collected before rough plumbing and electrical
  • Vent hood routing resolved against the joists and the roof or wall penetration
  • Finished floor thickness accounted for in base cabinet and appliance heights
  • Blocking set in the walls for uppers, floating shelves and heavy pantry doors
  • Cabinet order placed against the construction schedule, not the drywall date

Framed, frameless, and the box

Framed cabinets carry a hardwood face frame, which is stiff, gives the installer something to scribe and fasten through, and tolerates the out-of-square conditions in an old house, at the cost of opening width. Frameless hangs the doors directly on the box, buying more usable interior and wider drawers for the same footprint, and it demands precise shimming because the reveals between doors show every error.

The box is where the real quality difference sits: a plywood box with a captured back holds a screw, survives a leak under the sink, and stays square up a staircase, where a particleboard deck swells from a slow drip and does not come back. Dovetailed solid-wood drawer boxes on full-extension undermount glides outlast stapled boxes on side-mount slides by a wide margin, and we spec soft-close as the default.

The showroom, and old houses

A painted white door reads as three different colors under showroom lighting, under your kitchen fixture, and next to a south-facing window in January, so the Dover showroom is set up to compare doors, finishes and samples side by side, run drawers on different glides, and send a sample door home with you for a week. Nova Kitchens & Designs, our cabinetry and design arm, shares the showroom and handles cabinetry-only projects directly.

Nothing in a house built in Dover in 1890 is square, level or plumb, so we measure the room in several places, set the bases level off the high point of the floor, and design in fillers and scribe moulding so the discrepancy hides in the toe kick and behind the crown. Lead times run a couple of months for semi-custom from a released order and longer for full custom, and a finish or door change after release restarts the clock, which is why selections get locked early.

Cabinet doors, flooring, tile and countertop samples are out at our showroom in Dover, NH. Visit the showroom

How it goes

How the job runs

  1. 01

    Measure the room as it is

    Multiple measurements per wall, diagonals for square, floor elevations at each corner, and locations of every existing pipe, duct, joist and window.

  2. 02

    Layout, appliances and selections

    We work the layout against how you use the room, lock the appliance specs, then set door style, finish, hardware and interior fittings with the samples in front of you at the Dover showroom.

  3. 03

    Release the order early

    Drawings get reviewed and signed, the order is released, and the delivery date becomes a fixed point in the construction schedule that floors, paint, countertops and tile are sequenced around.

  4. 04

    Install, scribe, and hand off to the counter template

    Boxes set level off the high point of the floor, scribed to the walls, doors tuned to even reveals. Once the bases are fastened, the countertop templater comes in, and backsplash tile follows the counters.

What we install

Materials and brands we work with

  • Framed and frameless construction
  • Plywood box construction
  • Dovetailed drawer boxes
  • Full-extension undermount soft-close glides
  • Concealed adjustable hinges
  • Painted and stained maple
  • White oak, rift and plain sawn
  • Cherry and walnut
  • Thermofoil and laminate doors
  • Semi-custom and full-custom lines
  • Scribe moulding, fillers and matching end panels

Want to go deeper on cabinets?

Nova Kitchens & Designs is our dedicated cabinetry and design arm, with the full product range, the design process and the showroom galleries.

Visit the kitchens site

Questions

Straight answers

Do I have to be doing a whole renovation to get cabinetry from Nova?
No. The reason to bring cabinetry to Nova Building Co is when it is entangled with construction: a wall coming out, a window moving, a floor being replaced, plumbing and electrical being relocated. Cabinetry and design on its own is what Nova Kitchens & Designs is set up for, and it shares the same Dover showroom.
How long do cabinets take to arrive?
Semi-custom lines commonly run a couple of months from the day the order is released, and custom shops run longer, sometimes well beyond that. The clock starts when drawings are approved and the order goes in, not at your first appointment. That is why we push to lock selections early, even before demo happens.
Is plywood worth it over particleboard?
In the sink base and the cooktop base, yes, because those are the cabinets that get wet and get abused. Elsewhere a well-built particleboard box with good hardware serves a long time in a dry kitchen, and the savings can go into better drawer glides or the door style you want. What we will not do is put a particleboard deck under a sink.
My kitchen is in a 1900 house and nothing is square. Is that a problem?
It is normal on the Seacoast and it is handled with design, not force. We measure the room in several places, set the base cabinets level off the high point of the floor, and design in fillers and scribe moulding so the walls and ceiling can wander without the cabinet line following them. Framed cabinets are somewhat more forgiving here than frameless, which is worth knowing before you commit to a look.
Can I keep my existing cabinets and just change the doors?
Refacing is real and can be the right call if the boxes are plywood, square, solidly attached, and the layout works for you. It is the wrong call if the layout is the problem, the boxes are swollen or racked, or you want drawers where there are currently doors. We will look at the boxes and tell you which situation you are in.

Planning cabinetry into a bigger project?

Tell us what you're planning. We'll walk the property, talk through what's realistic, and put together a scope and a number you can hold us to.

Showroom in Dover, NH · Serving the New Hampshire Seacoast and southern Maine

Call (603) 522-7006